<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title></title>
	<atom:link href="http://www.bidwater.org/bidblog/?feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://www.bidwater.org/bidblog</link>
	<description></description>
	<lastBuildDate>Tue, 24 Aug 2010 18:05:29 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Advertisment For Bid</title>
		<link>http://www.bidwater.org/bidblog/?p=430</link>
		<comments>http://www.bidwater.org/bidblog/?p=430#comments</comments>
		<pubDate>Tue, 24 Aug 2010 18:05:10 +0000</pubDate>
		<dc:creator>Ed Mitchell</dc:creator>
				<category><![CDATA[System Status Updates]]></category>

		<guid isPermaLink="false">http://www.bidwater.org/bidblog/?p=430</guid>
		<description><![CDATA[advertisement for bid
]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.bidwater.org/bidblog/wp-content/uploads/2010/08/advertisement-for-bid.pdf">advertisement for bid</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.bidwater.org/bidblog/?feed=rss2&amp;p=430</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>PHASE 1 PLANS</title>
		<link>http://www.bidwater.org/bidblog/?p=268</link>
		<comments>http://www.bidwater.org/bidblog/?p=268#comments</comments>
		<pubDate>Wed, 11 Nov 2009 15:27:24 +0000</pubDate>
		<dc:creator>Ed Mitchell</dc:creator>
				<category><![CDATA[System Status Updates]]></category>

		<guid isPermaLink="false">http://www.bidwater.org/bidblog/?p=268</guid>
		<description><![CDATA[Phase 1 plans are available for review in the BID office during normal business hours.
]]></description>
			<content:encoded><![CDATA[<p>Phase 1 plans are available for review in the BID office during normal business hours.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.bidwater.org/bidblog/?feed=rss2&amp;p=268</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Pump Station Contract Awarded</title>
		<link>http://www.bidwater.org/bidblog/?p=240</link>
		<comments>http://www.bidwater.org/bidblog/?p=240#comments</comments>
		<pubDate>Wed, 17 Jun 2009 22:24:27 +0000</pubDate>
		<dc:creator>Ed Mitchell</dc:creator>
				<category><![CDATA[System Status Updates]]></category>

		<guid isPermaLink="false">http://www.bidwater.org/bidblog/?p=240</guid>
		<description><![CDATA[Benton Irrigation District Awards River Pump Station Contract
 
Benton Irrigation District (BID) awarded Emery and Sons Construction, Incorporated of Salem, Oregon the contract for construction of the District’s river pump station on Tuesday, June 3.  Emery and Sons offered the low bid of $6.2M to build a 3,900 horsepower pump station that will take water from [...]]]></description>
			<content:encoded><![CDATA[<p class="MsoNormal" style="margin: 0in 0in 0pt; text-align: center;" align="center"><span style="font-size: small;"><span style="font-family: Arial Narrow;"><strong>Benton</strong><strong> Irrigation District Awards River</strong><strong> Pump Station Contract</strong></span></span></p>
<p class="MsoNormal" style="margin: 0in 0in 0pt; text-align: center;" align="center"><span style="font-size: small; font-family: Arial Narrow;"> </span></p>
<p class="MsoNormal" style="margin: 0in 0in 0pt;"><span style="font-size: small; font-family: Arial Narrow;">Benton Irrigation District (BID) awarded Emery and Sons Construction, Incorporated of Salem, Oregon the contract for construction of the District’s river pump station on Tuesday, June 3.<span style="mso-spacerun: yes;">  </span>Emery and Sons offered the low bid of $6.2M to build a 3,900 horsepower pump station that will take water from the Yakima River, pressurize it and deliver it to the 4,650 acres that comprise BID.<span style="mso-spacerun: yes;">  </span>A total of 10 bids were received.</span></p>
<p class="MsoNormal" style="margin: 0in 0in 0pt;"><span style="font-size: small; font-family: Arial Narrow;"> </span></p>
<p class="MsoNormal" style="margin: 0in 0in 0pt;"><span style="font-size: small; font-family: Arial Narrow;">BID’s portion of cost for the river pump station is $1.1M.<span style="mso-spacerun: yes;">  </span>The Bureau of Reclamation and Washington Department of Ecology are funding the balance of the river pump station costs.</span></p>
<p class="MsoNormal" style="margin: 0in 0in 0pt;"><span style="font-size: small; font-family: Arial Narrow;"> </span></p>
<p class="MsoNormal" style="margin: 0in 0in 0pt;"><span style="font-size: small; font-family: Arial Narrow;">The river pump station is the first phase of construction on BID’s $28.6M project to convert from a open canal system to a fully pressurized irrigation system.<span style="mso-spacerun: yes;">  </span>Construction on the river pump station will start in July of this summer and is scheduled to be completed by March of 2010 and in operation for the 2010 irrigation season.<span style="mso-spacerun: yes;">  </span>Benton Rural Electrification Association will provide electricity to the river pump station.</span></p>
<p class="MsoNormal" style="margin: 0in 0in 0pt;"><span style="font-size: small; font-family: Arial Narrow;"> </span></p>
<p class="MsoNormal" style="margin: 0in 0in 0pt;"><span style="font-size: small; font-family: Arial Narrow;">Design of the first portion of the conveyance system is underway.<span style="mso-spacerun: yes;">  </span>Work to install piping to approximately one-third of the District’s water users is scheduled to be awarded in October of 2009.<span style="mso-spacerun: yes;">  </span>Delivery of water from the pressurized system to the first phase of the project is scheduled for the 2010 irrigation season.<span style="mso-spacerun: yes;">  </span>Deliveries to the remaining two-thirds of the District are scheduled to be completed by the 2012 irrigation season.</span></p>
<p class="MsoNormal" style="margin: 0in 0in 0pt;"><span style="font-size: small; font-family: Arial Narrow;"> </span></p>
]]></content:encoded>
			<wfw:commentRss>http://www.bidwater.org/bidblog/?feed=rss2&amp;p=240</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CONTACT INFORMATION</title>
		<link>http://www.bidwater.org/bidblog/?p=214</link>
		<comments>http://www.bidwater.org/bidblog/?p=214#comments</comments>
		<pubDate>Wed, 11 Mar 2009 19:02:47 +0000</pubDate>
		<dc:creator>Ed Mitchell</dc:creator>
				<category><![CDATA[System Status Updates]]></category>

		<guid isPermaLink="false">http://www.bidwater.org/bidblog/?p=214</guid>
		<description><![CDATA[City: Benton City   State: WA   Zip: 99320
Mailing Adress: PO BOX 626
Psysical Adress: 47506 N Highland
Billing phone # 509-588-4396
Water Line # 509-588-3510
Fax # 509-588-8170
Emergency # 509-543-0071  (FOR FLOODING EMERGENCYS ONLY)

]]></description>
			<content:encoded><![CDATA[<p><strong>City:</strong> Benton City   <strong>State:</strong> WA   <strong>Zip:</strong> 99320</p>
<p><strong>Mailing Adress:</strong> PO BOX 626</p>
<p><strong>Psysical Adress:</strong> 47506 N Highland</p>
<p><strong>Billing phone #</strong> 509-588-4396</p>
<p><strong>Water Line #</strong> 509-588-3510</p>
<p><strong>Fax #</strong> 509-588-8170</p>
<p><strong>Emergency #</strong> 509-543-0071 <strong> (FOR FLOODING EMERGENCYS ONLY)</strong></p>
<p><strong></strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.bidwater.org/bidblog/?feed=rss2&amp;p=214</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>SYSTEM STATUS</title>
		<link>http://www.bidwater.org/bidblog/?p=180</link>
		<comments>http://www.bidwater.org/bidblog/?p=180#comments</comments>
		<pubDate>Wed, 28 Jan 2009 23:36:54 +0000</pubDate>
		<dc:creator>Ed Mitchell</dc:creator>
				<category><![CDATA[System Status Updates]]></category>

		<guid isPermaLink="false">http://www.bidwater.org/bidblog/?p=180</guid>
		<description><![CDATA[Affected Area: ENTIRE SYSTEM
Status: NORMAL
System Type: BID
Problem Isolation:SYSTEM NORMAL
Outage Repair Date:
Message;  Assessments must be paid before receiving water.
Water must be ordered by website or by calling 509-588-3510

BID Foreman
]]></description>
			<content:encoded><![CDATA[<p><strong>Affected Area:</strong> ENTIRE SYSTEM</p>
<p><strong>Status: NORMAL</strong></p>
<p><strong>System Type:</strong> BID</p>
<p><strong>Problem Isolation:SYSTEM NORMAL</strong></p>
<p><strong>Outage Repair Date:</strong></p>
<p><strong>Message;  Assessments must be paid before receiving water.</strong></p>
<p><strong>Water must be ordered by website or by calling 509-588-3510<br />
</strong></p>
<p>BID Foreman</p>
]]></content:encoded>
			<wfw:commentRss>http://www.bidwater.org/bidblog/?feed=rss2&amp;p=180</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
